Больше информации по резюме будет доступно после регистрации
ЗарегистрироватьсяWas online today at 00:36
Candidate
Male, 38 years, born on 14 June 1986
Not looking for a job
Kostanay, willing to relocate, prepared for business trips
Lead QA/QC Engineer/Inspector, Lead Construction Engineer (Civil, Mechanical,Piping,EX,E&I)
2 000 $ in hand
Specializations:
- Other
Employment: full time, part time, project work, volunteering, work placement
Work schedule: full day, shift schedule, flexible schedule, remote working, rotation based work
Work experience 13 years 1 month
September 2024 — currently
8 months
Dunga Operating GmbH
QC E&I EX Inspector
•Quality control of equipment assembly, verification of drawings and project documentation.
February 2020 — August 2024
4 years 7 months
Oil and Gas... Show more
QC E&I EX Inspector
•Project on installation of 100 new oil production wells.
•Project for installation of new Oil Heaters.
•QC Inspection visit to the base of the manufacturer of Compressors WASCO Engineering, Indonesia.
•Quality control of equipment assembly, verification of drawings and project documentation.
September 2017 — January 2020
2 years 5 months
Kazakhstan, www.maerskoil.com
Chemical Production, Fertilizers... Show more
QA/QC Engineer/Inspector E&I/Mechanical
• Phase 3 Gathering system. D line. modification of the dunga field in the Mangystau region.
• Phase 3 CSWT project. (produced water, seawater) treatment and water injection system plants. the construction of the plants in the territory of the dunga field of the Mangystau region.
• Phase 2-Construction and reconstruction of an oil and gas production plant, Installation of wells. FMP Projects.
•Assure the quality of company and contractor, procured materials and equipment during acceptance control.
•Comply with the project Quality Management System (QMS) that assures MOK/TOTAL policies, objectives, targets and standards are, or will be, met within Engineering and Projects Department.
•Support to the Project and Construction Engineers by monitoring that the project activities are in compliance with company standards.
•Work closely with the Project Engineers to document and ensure that test and inspection records are accurate and complete.
•Continually improve the QA/QC system as required.
•Work with local contractors to help them develop and implement QMS compatible with MOK and specific project needs.
•Ensure that non/conformances identified during inspections are documented and reported.
•To liaise with contractors and other company staff for coordination of construction activities.
•To raise QA awareness and ensure value adding QA considerations are effectively addressed throughout design and project execution.
•Advise Project and Construction Engineers and their supervisors of quality problem areas and recommended corrective actions.
•Internal and contractor QA/QC surveillance.
•Familiarize in company safety philosophy and strive to be a good example for all with respect to safety approach and behavior.
•Dealing with confidential information in a professional way.
-Working with SAP System.
September 2016 — September 2017
1 year 1 month
LLP “SitekCaspian”
Instrument and Electrical Quality Control Engineer
•Kashagan Field Development Experimental Program project 2011-0707 «Construction of Rail Loading Facilities for Eskene West Rail Project (EWRP)» General contractor «ISKER»
•Scheduling, planning and co-coordinating inspection activities with a team of Inspectors as a lead inspector.
•Performed material receiving inspection of Ex equipment/ instruments and accessories.
•Verification of quality document availability for materials being used in construction (passports, certification, test and laboratory results etc.).
•Detail inspections of Electrical, Instrumentation and Telecom equipment's in Hazardous Areas (Zone 1, 2 and 3) (EX INSPECTION).
•Inspection of switchboard, UPS, lighting, heat tracing distribution panels.
•Inspection of lighting, earthing and heat tracing system.
•Inspection of instrumentation, Fire and Gas detection, Telecom system.
•Ensure assigned Company and contractor personnel comply with Company and contractor HSE procedures, plans and policies.
June 2016 — September 2016
4 months
LLP “SitekCaspian”
Atyrau
Instrument and Electrical Quality Control Engineer Cathodic Protection
•Kashagan Field Development Experimental Program project «Kashagan Pipeline Replacement Project Gas&Oil» General contractor «ERSAI Caspian Contractor LLC»
-Installation of cathodic protection of the pipeline of oil and gas equipment installation andinstrument.
•Coordination with Pre-inspection for project completion team, pre-walk down.
•Planning, organization and control MC & Com walk downs with Operation Coordinator.
•Control of MC Dossiers & Com Dossiers with Client.
•Hand-over MC & Com Dossiers with MC & Com walk downs to operation, commission reception.
•Coordinate with Punch team.
•Control of Punch list closure.
•To develop, accompany, coordinate and approve design decisions.
•Ensuring effective and trouble-free operation and Uniform loading of all workers.
•Control over the implementation of the established tasks by each performer.
•Check of qualities of performance, Interaction with subcontractors, the Customer and designers.
•Work from the project documentation, drawings and documentation of manufacturers, drawing up and verification of executive documentation.
•As-built documentation execution control.
•Attend and contribute to site and project technical meetings.
•Working with Excel, Adobe, EDMS and SPITCH databases.
January 2016 — June 2016
6 months
LLP ECC “SpetsStroyProject”
Lead construction Engineer (Civil,Mechanical,E&I,Piping)
•Atyrau oil processing plant LLP «OPP»/Construction of the complex deep refining/ Esterification of light oil catalytic cracking 3207.Customer “Kaz Munai Oil&Gas”/General contractor LLP «Sinopec Engineering Group»
-Construction and installation work of the, construction of reinforced concrete, metal structures, water supply and drainage, process piping and equipment
-Development of technical solutions and development of techniques making
- Control and organization of the construction process
Chief engineer performs the following duties:
- Defines technical policy and direction of technical development.
- It provides increased efficiency and productivity, reduced costs, efficient use of production resources, conformity of products applicable national standards.
- To lead the development of measures for the reconstruction and modernization of the enterprise.
- Organizes work to improve the range and quality, improvement and updating of products.
- Carries out the control over observance of project, design and technological discipline, rules and regulations on labor protection, safety, industrial hygiene and fire safety, environmental regulations, health authorities and bodies which carry out the technical supervision.
- Ensures timely preparation of technical documentation.
- Organizes research and experiments, testing of new techniques and technologies, as well as work in the field of scientific and technical information, rationalization and innovation, the spread of advanced production experience.
- It organizes training and retraining of workers and engineering and technical personnel and ensures continuous improvement training.
- Supervises the activities of the technical services of the enterprise, controls the results of their work, the state of labor and production discipline in the subordinate units.
February 2013 — June 2013
5 months
LLP SP“Souyzcomlect”
Construction Engineer of production and technical department (Civil,Mechanical,E&I)
•Construction of the anode plant in the territory of the plant JSC “Kazakhstan Electrolysis Plant project Customer LLP«KAS»
-Construction and installation work of the heating and ventilation, construction of reinforced concrete, metal structures, water supply and drainage, electric lines, process piping and equipment,F&G (Start of work to complete commissioning)
-Development of technical solutions and development of techniques making
1. Carries out technical supervision of construction and installation works, acceptance of works and finished objects.
2. Controls the progress of the construction plans, the compliance of the volumes, terms and quality of construction and installation works, as well as the quality of the materials, products, designs of the approved design estimates, working drawings, construction norms and rules, standards, technical conditions, occupational safety standards.
3. Participates in resolving issues on making changes to projects in connection with the introduction of more advanced technological processes, volumetric planning and constructive solutions that reduce the cost and improve the technical and economic performance of construction and reconstruction facilities.
4. Takes part in the review and approval of project design changes arising during the construction process, promptly solves the issues of replacing, if necessary, materials, products, structures (without reducing the quality of construction sites).
5. He studies the causes that cause failure of terms and deterioration of the quality of construction and installation works, takes measures to prevent and eliminate them.
6. Carries out technical acceptance of completed construction and installation works and facilities, prepares necessary technical documentation. Participates in the work of the commissions for the acceptance of construction projects and putting them into operation.
7. Controls the quality of elimination of imperfections, defects in a timely manner.
8. Keeps records of completed construction and installation works and prepares the necessary data for reporting on the implementation of construction plans.
November 2012 — February 2013
4 months
LLP SP“Souyzcomlect”
Construction Engineer of production and technical department(Civil, Mechanical, E&I)
•Arrangement of project water heating boiler “Aktobe City”. Aktobe
-Construction and installation work of the heating and ventilation, construction of reinforced concrete, metal structures, water supply and drainage, electric lines, process piping and equipment,F&G (Start of work to complete commissioning)
-Development of technical solutions and development of techniques making
March 2012 — November 2012
9 months
LLP SP“Souyzcomlect”
Kyzylorda
Engineer of production and technical department(Civil, Mechanical, E&I)
•Energy complex with steam turbine generator project/ Customer “KazAtomPromm”
-Construction and installation work of the heating and ventilation, construction of reinforced concrete, metal structures, water supply and drainage, electric lines, process piping and equipment,F&G (Start of work to complete commissioning)
-Development of technical solutions and development of techniques making
April 2011 — March 2012
1 year
LLP “Montashspecstroy MSS
Atyrau
Instrument and Electrical Quality Control Engineer
•Kashagan Field Development Experimental Program project 2008-0270 «Agip KCO»
•Responsibility behind realization of production tasks.
•Scheduling, planning and co-coordinating inspection activities with a team of Inspectors as a lead inspector.
•Performed material receiving inspection, handling storage and preservation inspections and ensured contractor is compliying to Company requirements.
•Verification of quality document availability for materials being used in construction (passports, certification, test and laboratory results etc.).
•Ensure assigned Company and contractor personnel comply with Company and contractor HSE procedures, plans and policies.
•Equipment’s installation and inspection in Hazardous area (EX INSPECTION).
•Work with Site quality coordinator and keep him informed of work status, Quality and ATEX issues, challenges and corrective actions needed to meet project objectives.
•Inspection of power transformer, switchboard, UPS, lighting, earthing and heat tracing system.
•Inspection of instrumentation, HVAC devices, Fire and Gas detection, TELECOM and warning systems, signal, grounding, feeding instrumentation cables, junction box and instrumentation panels in substations. Manifolds pressure testing.
•Red Line Mark Up on drawings for E&I and Telecom Disciplines.
October 2009 — March 2011
1 year 6 months
LLP «Montazhservice»
Atyrau
Quality Control Engineer (Piping system/Equipment/Steel construction/Tanks)
•Kashagan Field Development Experimental Program project 2004-0934G «Agip KCO»
- Installation of equipment and welding of industrial pipelines, oil tanks (hydrotest, pneumatic test)
- Work cooperatively with Construction team
- Perform oversight inspection of Welding, Piping, Structural, Civil and Painting activities
- Study, Review and Approval Contractors’ WPS, WPQR, WQT , and other QC-Construction procedures.
- Coordinate and inspection of whole steps of Welding Procedure Qualification (pWPS, PQR, WPS)
- Supervision and Inspection of Welders Performance Qualification Test
- Review and approval of VT, PT, MT and RT.
- Identify non conformances and take preventive and corrective actions.
- Advise the Contractor of corrective actions and/or assist them in the resolution & closing of any NCRs;
- Organization of the Walks down with preparation of Punch lists-Inspection of Coating activites:
-Review coating system(s) to be used in the specific areas;
-Monitoring of coatings application;
-Measure and record dry film thickness of each coat as well as finished surface;
-Verify storage environment of the coating materials.
- Perform Incoming Material Quality Control.
Skills
Skill proficiency levels
Driving experience
Own car
Driver's license category BAbout me
High level of responsibility, diligence, ability to make independent decisions, clarity, rigor, stress, teamwork, energy, dedication, hard work, diligence, sociability, honesty, ability to work independently. My hobbies are traveling, art and design.
- There is experience in organizing construction and installation works, managing the construction process on major international projects, monitoring the performance of works on project sites, quality control.
- Supervision over the performance of construction work and acceptance of completed facilities from contractors
-Working with project organizations, contractors, monitoring the implementation of M & E plans.
-Accept participation in the review and approval of project design changes arising during the construction, prompt decision of questions on the replacement, if necessary, of materials, products, structures.
-Correspondence of changes in the project on sections CIV, MEC, ELE, INS, LOP, COM etc. with the project institute.
- Implementation of changes in project documentation, drafting of project specifications for materials, applications and approval when purchasing with suppliers all necessary technical characteristics of materials
-Ability to lead a group of subordinates in the production and technical department.
Oil & Gas (LNG) Site/Yard experience during construction/commissioning. Excellent understanding of Systems Completion & Turnover Process - Turnover Milestones, Turnover Certificates (Dossier).
Understanding of Construction & Commissioning quality requirements, As-Built drawings, Mechanical Completion. Understanding the full scope of work, contract type and milestone schedules.
In-depth knowledge of electrical procedures, construction/commissioning experience of 110kV HV Switchgears, 110/35kV Step-up / Step-down Transformers (CG/GE/ABB), UPS AC/DC systems, Electrical Heat Tracing, Cathodic Protection, LV/MV/HV Distribution system, Fire & Gas, Telecom (FOC), ACS systems.
Broad construction experience with gas turbine, steam turbine, compressors, and diesel engine, instrumentation and associated control systems.
Higher education
2004
Kostanay Social Technical University
Computer Engineering, BACHELOR OF ENGINEERING AND TECHNOLOGY
Languages
Citizenship, travel time to work
Citizenship: Kazakhstan
Permission to work: Kazakhstan
Desired travel time to work: Doesn't matter